Project Overview
Timeline
Total: 6 months
24 weeks
Phased delivery
Team
3-4 developers
Senior/Mid-level
Optimized team size
Technology Stack
Security
AES-256 Encryption
Military-grade security
Key Deliverables
Budget Summary
Budget Allocation
Optimization Strategy
Scope Reduction Strategy
Essential features prioritized
Phased Implementation
Core system first, enhancements later
Optimized Team Size
3-4 developers for efficiency
Budget Constraints
Significant cost reduction applied
Cost Breakdown
Detailed Development Phase Breakdown
Budget Optimization Strategy
Original Comprehensive Scope
Total estimated cost: BDT 37,52,000
Includes all advanced features, visitor management, and comprehensive multi-site functionality.
Optimized for BDT 6,00,000
Reduced scope: BDT 4,00,000 (new development)
Focus on essential functionality with significant scope reduction to meet budget constraints.
Optimized Budget for BDT 6,00,000
Final Budget Allocation
Scope Reduction Strategy
Excluded Features
- • Advanced visitor management system
- • Comprehensive multi-site features
- • Advanced reporting analytics
- • Complex cross-site communication
Core Deliverables
- • Basic access control system
- • Essential personnel management
- • Core RFID card management
- • Web-based interface
- • Basic documentation
Comprehensive Development Phase Breakdown
Phase 1: Requirements Analysis & System Architecture (BDT 80,000)
Task | Duration | Rate (BDT/Hour) | Hours | Cost (BDT) |
---|---|---|---|---|
SDK Documentation Analysis & Integration Planning | Reduced scope | 2,500 | 20 | 50,000 |
Naval Requirements Gathering & Documentation | Essential only | 2,200 | 10 | 22,000 |
Simplified Architecture Design | Single-site initial | 2,800 | 3 | 8,400 |
Phase 1 Subtotal | 80,000 |
Phase 2: Core Personnel Management System (BDT 60,000)
Task | Scope | Rate (BDT/Hour) | Hours | Cost (BDT) |
---|---|---|---|---|
Basic User Authentication & Role Management | Simplified | 2,200 | 15 | 33,000 |
Employee Profile Management | Basic naval hierarchy | 2,000 | 10 | 20,000 |
Essential Search Functions | Basic only | 1,800 | 4 | 7,200 |
Phase 2 Subtotal | 60,000 |
Phase 3: RFID Card Management & SDK Integration (BDT 1,20,000)
Task | Scope | Rate (BDT/Hour) | Hours | Cost (BDT) |
---|---|---|---|---|
Core UDP Communication Implementation | Essential functions | 2,800 | 25 | 70,000 |
Basic Controller Discovery | Single controller | 2,500 | 10 | 25,000 |
Basic Card Operations | Core functions only | 2,500 | 10 | 25,000 |
Phase 3 Subtotal | 1,20,000 |
Complete Development Phase Summary
Remaining Development Phases (Reduced Scope)
Total Budget Summary
Note: This represents a significant scope reduction from the original BDT 37,52,000 comprehensive system to meet the BDT 6,00,000 budget constraint.
Technical Specifications
System Architecture
Security Features
Encryption
AES-256
Authentication
JWT + 2FA
Network
VPN + Firewall
Audit Logging
Comprehensive
Function Implementation Details
Controller Communication
Discovery
0x94
Status
0x20
Time Sync
0x30-0x32
Access Control
Door Control
0x40
Privileges
0x50-0x5C
Records
0xB0-0xB4
Network Specifications
Port
60000
Packet Size
64 bytes
Deployment Requirements
Implementation Timeline
Optimized Development Timeline
6 monthsMonths 1-2
- Requirements & Architecture
- Personnel Management System
Months 3-4
- RFID & SDK Integration
- Access Control Core
Months 5-6
- Web Interface & Testing
- Deployment & Documentation
Budget Optimization Impact
ImportantExcluded Features
- Advanced visitor management
- Comprehensive multi-site features
Future Enhancements
- Can be added in future phases
- With additional funding

Bangladesh Navy
Access Control System Budget